Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Related articles in Quarterly Journal of Engineering Geology and Hydrogeology
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Connorton, B. J.
Right arrow Search for Related Content
Quarterly Journal of Engineering Geology and Hydrogeology; 1978; v. 11; issue.2; p. 203;
DOI: 10.1144/GSL.QJEG.1978.011.02.08
© 1978 Geological Society of London

Discussion

Discussion on ‘The analysis and planning of step drawdown tests’ by L. Clark

B. J. Connorton

Thames Conservâncy Division, Thames Water Authority, , Nugent House, Reading.

May I congratulate Lewis Clark on his paper covering the analysis and planning of step drawdown tests. I think the subject of well performance is due for a ‘shake-up’ and this paper will hopefully initiate some useful scientific discussion in the right direction.

I have two main criticisms to make. The first one is that the author considers only continuous step drawdown tests; he makes no mention of conducting discontinuous or intermittent step drawdown tests in which each drawdown step is followed by a recovery period of at least equal duration. I have used both types of test and have found the latter provides the more reliable results for the following reasons:

(i) the problem of errors caused by fluctuations in pumping rate within a given step affecting the reliability of data from subsequent steps does not arise;

(ii) the problem of errors caused by extrapolating the time-drawdown trend in order to calculate incremental drawdown does not arise;

(iii) the analysis of transmissivity from the time-drawdown data is straightforward; each drawdown step is treated simply as a short constant rate test, and since errors caused by (i) and (ii) will not exist, the values thus obtained will be more reliable;

(iv) there will be as many recovery steps to analyse as there are drawdown steps, and hence more ‘stabs’ at transmissivity. The recovery ‘Q’ values are the same as the preceding drawdown step value; the problem of estimating an averaged or weighted effective ‘Q’ for the recovery test does not

...

This 250-word extract was created in the absence of an abstract.


Related articles in Quarterly Journal of Engineering Geology and Hydrogeology:

The analysis and planning of step drawdown tests
Lewis Clark
Quarterly Journal of Engineering Geology and Hydrogeology 1977 10: 125-143. [Abstract]