Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Related articles in Quarterly Journal of Engineering Geology and Hydrogeology
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Barton, N.
Right arrow Search for Related Content
Quarterly Journal of Engineering Geology and Hydrogeology; 1978; v. 11; issue.3; p. 263-265;
DOI: 10.1144/GSL.QJEG.1978.011.03.06
© 1978 Geological Society of London

Discussion

Discussion on ‘Peterhead Power Station cooling water intake tunnel: An engineering case study’ by

N. Barton

Norwegian Geotechnical Institute, , PO Box 40, Taasen Oslo 8, Norway,

The authors' comparison of site investigation predictions and actual tunnelling conditions encountered at 50 m depth in partly weathered granite make interesting reading. In particular, it is encouraging to note the increasing use of classification systems as an aid to tunnel support design decisions. The authors state that ‘the support system generally used in the tunnel varied from that actually recommended in the site investigation report but lay within the range of alternatives suggested by Bieniawski’ (Bieniawski 1973). The contractor in fact elected to use steel ribs as primary (temporary) support ‘in distinct preference to the rather more sophisticated roof bolting with sprayed concrete’.

Application of Bieniawski (1973) had in fact shown that suitable primary support for the 4.6 m span tunnel should be found among the following alternatives:

(i) B l-1.5m + S(mr)30mm

(ii) S 100 mm (crown), 50 mm (sides) (with occasional mesh or bolts as required)

(iii) light steel sets 1.5 to 2.0 m spacingwhere S = shotcrete, (mr) = mesh reinforcement, B = rock bolts of given spacing.

The final 300 mm thick concrete lining cast to a finished diameter of 4.0 m was presumably dictated by other requirements, since the authors state that ‘the rock together with its primary support system (should) provide the principal structural strength of the tunnel whether empty and at atmospheric pressure or full of water under tidal pressure’.With the above requirement in mind it is reasonable to apply the NGI Q-system of classification (Barton et al. 1974, 1975)

...

This 250-word extract was created in the absence of an abstract.


Related articles in Quarterly Journal of Engineering Geology and Hydrogeology:

Peterhead Power Station cooling water intake tunnel: An engineering case study
J. M. Edmond and J. D. Graham
Quarterly Journal of Engineering Geology and Hydrogeology 1977 10: 281-301. [Abstract]