Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow An erratum has been published
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Related articles in Quarterly Journal of Engineering Geology and Hydrogeology
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Binnie, G. M.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1978; v. 11; issue.4; p. 305-324;
DOI: 10.1144/GSL.QJEG.1978.011.04.04
© 1978 Geological Society of London

Article

The collapse of the Dale Dyke dam in retrospect*

G. M. Binnie, F.ENG., F.R.S.

Artillery House, Artillery Row, Westminister, London SWIP IRX.

Introduction

The original Dale Dyke dam situated 9 miles west of Sheffield on the River Loxley, a tributary of the River Don, collapsed suddenly on the 11th March, 1864. Nearly 250 people lost their lives and there was considerable damage to property, including some in the city itself.Amey (1974) gives a very readable account of the disaster and its aftermath.

Expert opinion at the time was divided as to the cause of the collapse of the dam, sometimes referred to by contemporary writers as the Bradfield dam from its location near the village of Bradfield in Bradfield Dale. One school of thought maintained that it was due to leakage from pipes beneath the embankment and consequential erosion, and another that it was due to a landslide which encroached upon the downstream toe of the embankment. More than 100 years have passed since these and other theories on the cause of the breach were put forward. In the light of the experience that has been gained since then in the behaviour of earth dams, an attempt has been made to draw fresh conclusions from a review of the evidence.

Contemporary sources

An inquest on the disaster was held on 24th and 25th March 1864; a verbatim account is given in a contemporary Parliamentary report (Sheffield Waterworks Bill 1864). Both the Sheffield Waterworks Company, who owned the reservoir, and the Sheffield Corporation, who wished to buy out the waterworks company, engaged consulting engineers to investigate the failure and their reports are available

...

This 250-word extract was created in the absence of an abstract.


Related articles in Quarterly Journal of Engineering Geology and Hydrogeology:

Postscript to ‘The collapse of the Dale Dyke dam in retrospect’
G. M. Binnie
Quarterly Journal of Engineering Geology and Hydrogeology 1983 16: 357-358. [Abstract]