Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Newbery, J.
Right arrow Articles by Baker, D. A. B.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1981; v. 14; issue.3; p. 195-205;
DOI: 10.1144/GSL.QJEG.1981.014.03.05
© 1981 Geological Society of London

Article

The stability of cuts on the M4 north of Cardiff

J. Newbery & D. A. B. Baker

Howard Humphreys and Partners, Thorncroft Manor, Dorking Road, Leatherhead, Surrey KT22 8JB

A case history is presented illustrating the role of engineering geology in the construction N of Cardiff of some 6.6 km of motorway cuttings in glacial moraine and bedrock of Lower Old Red Sandstone age.

The proposed cut at Wenallt, located at the foot of Wenallt Reservoir, had featured prominently in the Public Inquiry. Subsequently this proved to be the only location at which a large failure occurred. Differences between the assumed and actual geological conditions are described. Due to the geological structure and the low residual strengths of c' = 5 kN/m2 and {phi}' = 10.5° in the Devonian marl, the only practical solution involved major earthworks to remove the slipped material. The excavated mass was partially replaced with a toe berm which incorporated a variety of drainage measures.

Experience from this contract has substantiated the need for detailed geotechnical monitoring during construction of major cuts formed in folded and faulted soft rocks. This enables checks to be made on design assumptions, permits revised assessments of stability and facilitates redesign if required.