Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Horner, P. C.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1983; v. 16; issue.3; p. 211-219;
DOI: 10.1144/GSL.QJEG.1983.016.03.05
© 1983 Geological Society of London

Article

Specifications for bulk and selected fill materials in highway and other projects

P. C. Horner

Consulting Engineering Geologist, , 10 Riverside Road, Luton, Beds.

Bulk and selected fills are commonly required for the construction of embankments, pavements etc. In the UK many civil engineering contracts are carried out under the ICE form of contract, which incorporates a specification that defines the nature and properties of the materials that may be used and the limitations on construction methods that may be employed. Specifications are frequently unique documents that meet the specific needs of the contract, although many are based, at least in part, on the Specification for Road and Bridge Works, Department of Transport (1976a). As with other ‘standards’, experience and local conditions have resulted, in recent years, in the production of alternative or special specification clauses, some of which have caused difficulties in interpretation and quantification at the tender stage, and interpretation and implementation at the construction stage. This has in a number of cases led to contractual disputes or increased costs to the contractor and/or employer. Some of the specification clauses that have led to disputes are described, together with illustrations on how they may be improved.