Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Cottiss, G. I.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1984; v. 17; issue.3; p. 179-192;
DOI: 10.1144/GSL.QJEG.1984.017.03.02
© 1984 Geological Society of London

Article

Preliminary observations on the design and construction of a four-lane highway through expansive clay in Cyprus

G. I. Cottiss

Cottiss Geotechnical Consultants, , 43 York Road, Northampton NN1 5QJ; and , P.O. Box 3849, Nicosia, Cyprus

A case history is presented describing some aspects of the design process and the early stages of construction of a four-lane highway across an outcrop of expansive clay in southern Cyprus.

The clay, of the Moni Formation, affects 7.5 km of the total 85 km of the new road alignment between Nicosia and Limassol. A special construction treatment was devised to deal with anticipated swell-pressures from the clay beneath the pavement construction. The original concepts were reviewed and revised after the contractor took over the site. During the first half of the contract period, following new investigations, the standard cross sections were changed and the treatment was extended.

A minimum surcharge of 2 m of construction (filling plus pavement layers) was provided throughout the 7.5 km of cut and fill to balance the swell-pressures. Intercepting drains were also provided to prevent ground water entering the clay sub-grade layers. This minimum ground loading was adopted after a study of potential swell and from calculations made using measured soil classification values and a theoretical relationship devised elsewhere.

Cuttings in the clay were originally designed at 1:2 (vertical: horizontal) but a major slope failure shortly after excavation led to a flattening of this particular face and gave an indication that existing factors of safety on slope stability were low. There are old landslips on the natural slopes across which the highway runs. An instruction was given to the contractor to locate all waste tips away from these slopes to prevent re-mobilization of slipping.