Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Thompson, R. P.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1984; v. 17; issue.4; p. 339-348;
DOI: 10.1144/GSL.QJEG.1984.017.04.08
© 1984 Geological Society of London

Article

Geotechnical aspects of Greenodd by-pass

R. P. Thompson

Allott & Lomax, Fairbairn House, , Ashton Lane, Sale, Manchester.

This paper describes the geotechnical aspects of the site investigation and construction of a by-pass to Greenodd Village in the southern part of the Lake District. The proposed route ran along west bank of the River Leven, crossed the main channel of the river and rejoined the existing road south of Greenodd. The investigation revealed that in places deep deposits of soft alluvium existed. Using the field measurements of permeability to determine the rate of consolidation in preference to values measured in the laboratory oedometer tests, it was decided that an embankment could be constructed safely and within a reasonable time. During construction the increase in excess pore pressure was monitored and the rate of filling modified to ensure a minimum factor of safety was achieved.

The project also involved construction of two bridges. From the findings of the site investigation it was decided to adopt pile foundations with the piles being driven steel H piles having an enlarged section set back from the toe. This ensured that the pile reached the required driving set after only a short penetration into the gravel stratum underlying the soft alluvium. Pile tests were carried out on preliminary piles to confirm the adequacy of the design and on works piles to ensure the required load carrying capacity was actually achieved.