Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via HighWire
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Newman, R. L.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1985; v. 18; issue.2; p. 149-160;
DOI: 10.1144/GSL.QJEG.1985.018.01.04
© 1985 Geological Society of London

Article

Geological and geotechnical considerations, associated with some sections of the M25 construction

R. L. Newman

W. S. Atkins & Partners, Woodcote Grove, Ashley Road, Epsom, Surrey KT18 5BW

Introduction

A joint meeting of the Engineering Group and the Institution of Highway Engineers was held at Burlington House on Tuesday, 10 January 1984. The topic of the meeting inspired practising engineers, academics and researchers alike, and this was reflected in an extremely well attended meeting. The audience listened to a number of speakers who have been actively involved with construction of particular sections of the M25 and who related their experiences in dealing with various ground engineering problems. There is currently no project so prestigious nor so intently observed in the UK as the M25, and this fact together with the fascination of ground engineering meant that the meeting was destined to be of great interest.

The Chairman of the Engineering Group of the Geological Society, Dr A. B. Hawkins, introduced the meeting and related some facts about the M25. The 120 miles of 3–4 lane dual carriageway will constitute the largest orbital road in the world. The most heavily trafficked sections, for instance between the A30 and M4 in the southwest sector, are expected to accommodate between 70 000 and 80 000 vehicles during a 16-h day in 1987. The M25 will provide a much needed fast and problem-free route to cross London and its connections to 18 major radial link roads will greatly improve communications to and from central London. It is anticipated that it will generate traffic and that its excellent communications will encourage development of a new network of industry.

Figure 1 shows the present

...

This 250-word extract was created in the absence of an abstract.




This article has been cited by other articles:


Home page
Geological Society, London, Engineering Geology Special PublicationsHome page
A. H. Marsh and N. R. Greenwood
Foundations in Gault Clay
Geological Society, London, Engineering Geology Special Publications, 1995; 10: 143 - 160.
[Abstract] [PDF]