Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Pugh, R.C.
Right arrow Articles by Puell, F.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 2006; v. 39; issue.3; p. 241-247;
DOI: 10.1144/1470-9236/05-062
© 2006 Geological Society of London

First time landslide in Keuper mudstones in Avilés, Asturias, Spain

R.C. Pugh1,2 & F. Puell1,2,3

1 1Formerly with: GEOCISA, C/ Los Llanos de Jerez 10 y 12, 28820 Coslada, Madrid, Spain
2 2Present address: PAYMA Cotas S.A.U., C/ Francisco Sancha 10, 28034 Madrid, Spain(e-mail: geotecnia3@paymacolas.com)
3 3Present address: Complutense University of Madrid, Facultad de Ciencias Geologicas, Madrid, Spain

On 27 November 2003 at approximately 12 pm a failure occurred without warning on a 52° mudstone slope adjacent to the customer carpark of a large department store in Avilés, Spain. No physical damage was caused to the department store but a high-pressure water main in the upper part of the slope was ruptured. A major concern was the proximity of a six-storey residential building at a distance of only 10 m from the crown failure scarp. Additionally, the resulting spoil caused the closure of the goods access road and rendered unusable numerous parking spaces. The estimated volume of the failure was c. 2000 m3. Following the failure, emergency remedial works were implemented to ensure the short-term stability of the failed mass and prevent possible retrogression of the failure towards the buildings. Geotechnical instrumentation was installed to monitor the stability of the area. A back-analysis of the failure was undertaken and, in conjunction with the results of the site characterization, led to a definitive solution: a rock-fill gravity retaining wall and an upper anchored rock-fill gravity retaining wall were designed and constructed, and the water main was re-routed away from the slope.

Key Words: case studies • landslides • mudstone • retaining walls • slope stability