Lyell Collection

Quarterly Journal of Engineering Geology and Hydrogeology

Lyell Centre  |   Lyell Collection  |   Subscriptions   |   Geological Society  |   Email alerts  |   Online bookshop  |   Help


Keywords:
Author:
Advanced search>>
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow Request Permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Andric, M.
Right arrow Articles by Tarvydas, R. K.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation
Quarterly Journal of Engineering Geology and Hydrogeology; 1976; v. 9; issue.1; p. 1-24;
DOI: 10.1144/GSL.QJEG.1976.009.01.01
© 1976 Geological Society of London

Article

Engineering geology of the Gordon Dam, South West Tasmania

M. Andric*, G. T. Roberts & R. K. Tarvydas

, Hydro-Electric Commission Box 355D, G.P.O., Hobart 7001 Tasmania, Australia

The Gordon Dam is a double curvature concrete arch structure 140 m high, forming part of a hydro-electric scheme. The dam is sited on folded and faulted Precambrian quartzite. Driving adits was favoured over diamond drilling in siting the dam and for detailed investigations to prove the stability of the foundations.

Considerable excavation on the left abutment was necessary to remove unfavourable rock and a continuous pre-split face of 122 m was produced.

The geological conditions found during excavation were better than anticipated thus raising the computed factor of safety.